Team:NTU-Singapore/Modelling/Parameter/A B
From 2008.igem.org
(Difference between revisions)
Lalala8585 (Talk | contribs) |
Lalala8585 (Talk | contribs) |
||
Line 8: | Line 8: | ||
<div id="arrow"> | <div id="arrow"> | ||
<a href="https://2008.igem.org/Team:NTU-Singapore/Modelling/Parameter#GFP_production_system_with_logistic_growth"> | <a href="https://2008.igem.org/Team:NTU-Singapore/Modelling/Parameter#GFP_production_system_with_logistic_growth"> | ||
- | <img src="https://static.igem.org/mediawiki/2008/ | + | <img src="https://static.igem.org/mediawiki/2008/c/ce/Back_to_param_charac3.jpg" |
alt="Back to parameter estimation" | alt="Back to parameter estimation" | ||
title="Back to parameter estiamtion"> | title="Back to parameter estiamtion"> |
Latest revision as of 15:12, 28 October 2008
|
Parameter A & B analysis
The above is the results from our characterisation experiment
Here we attempt to change A & B over a range of values to observe how the two values affect the production of the complex. We are bound by a simple condition that A > B. We set A = 1 and vary B over a range.
Graph of A & B
We see here that as B gets closer to A the output it reduced. We choose B = 0.9 and A = 1, a 9:10 ratio.