Team:Harvard/Dailybook/Week12/Widgetry
From 2008.igem.org
(Difference between revisions)
(New page: 600px) |
|||
Line 1: | Line 1: | ||
[[Image:Baseline2.jpg | 600px]] | [[Image:Baseline2.jpg | 600px]] | ||
+ | |||
+ | '''Repeat Chemical and Heat Baseline Test''' | ||
+ | |||
+ | What we did: | ||
+ | -Retested wt Shewie with IPTG added, Tet added, and heated to 40C to different chambers | ||
+ | |||
+ | Results: | ||
+ | -Heating the chambers to 40C led to no current production | ||
+ | :-May have been a problem with the setup as Shewie seemed to have leaked out | ||
+ | -wt Shewie with IPTG and Tet added had normal current production | ||
+ | :-Current observed was between the two wt controls |
Revision as of 21:35, 26 October 2008
Repeat Chemical and Heat Baseline Test
What we did: -Retested wt Shewie with IPTG added, Tet added, and heated to 40C to different chambers
Results: -Heating the chambers to 40C led to no current production
- -May have been a problem with the setup as Shewie seemed to have leaked out
-wt Shewie with IPTG and Tet added had normal current production
- -Current observed was between the two wt controls