Team:NTU-Singapore/Notebook/25 July 2008

From 2008.igem.org

(Difference between revisions)
 
(2 intermediate revisions not shown)
Line 1: Line 1:
 +
<html><link rel="stylesheet" href="http://greenbear88.googlepages.com/ntu_igem.css" type="text/css"></html>
 +
 +
<div id="header">{{User:Greenbear/sandbox/header}}</div>
 +
 +
<div id="maincontent" style="margin-top:130px;">
 +
<html>
 +
<div id="arrow">
 +
<a href="https://2008.igem.org/Team:NTU-Singapore/Notebook">
 +
<img src="https://static.igem.org/mediawiki/2008/8/8d/Back_to_notebook.png
 +
"
 +
    alt="Back to Notebook"
 +
    title="Back to Notebook">
 +
</a>
 +
</div>
 +
</html>
 +
 +
=Friday 25 July=
 +
<div class="quote" style="margin:20px;">
 +
{|border="1" style="background-color:#ffffcc;" cellpadding="20"
 +
|
*Darius
*Darius
-
**Miniprep 23 tubes of bacteria, E7-ter, lysis, lsrA respectively.
+
**Miniprep 23 tubes of bacteria, E7-ter, Lysis Terminator, lysis, lsrA respectively.
-
*Digestion of E7-terminator, Lysis Standard Vector, LsrA standard vector.
+
*Digestion of E7-terminator, lysis Terminator, Lysis Standard Vector, LsrA standard vector.
 +
Heat inactivation at 80 celcius in thermal cycler before gel run.
*Run Gel Check
*Run Gel Check
**E7 showed a 2k Band, however, this is not conclusive as GFP vector and E7 Is of the same size.
**E7 showed a 2k Band, however, this is not conclusive as GFP vector and E7 Is of the same size.
Lysis standard vector is successful, showed a band between 100bp and 200bp(140bp)
Lysis standard vector is successful, showed a band between 100bp and 200bp(140bp)
LsrA standard vector failed.
LsrA standard vector failed.
 +
Lysis Terminator was kept in the fridge for saturday gel run due to time constraits i had on friday.
*PCR verification of E7 terminator. Ran PCR with different constituents.
*PCR verification of E7 terminator. Ran PCR with different constituents.
**Old E7 Primers, New E7 primers, E7 verification primers.
**Old E7 Primers, New E7 primers, E7 verification primers.
* Results seen on saturday morning.
* Results seen on saturday morning.
 +
</div>

Latest revision as of 02:33, 28 October 2008

Friday 25 July

  • Darius
    • Miniprep 23 tubes of bacteria, E7-ter, Lysis Terminator, lysis, lsrA respectively.
  • Digestion of E7-terminator, lysis Terminator, Lysis Standard Vector, LsrA standard vector.

Heat inactivation at 80 celcius in thermal cycler before gel run.

  • Run Gel Check
    • E7 showed a 2k Band, however, this is not conclusive as GFP vector and E7 Is of the same size.

Lysis standard vector is successful, showed a band between 100bp and 200bp(140bp) LsrA standard vector failed. Lysis Terminator was kept in the fridge for saturday gel run due to time constraits i had on friday.

  • PCR verification of E7 terminator. Ran PCR with different constituents.
    • Old E7 Primers, New E7 primers, E7 verification primers.
  • Results seen on saturday morning.