*Clinton and Yanis - Carried out statistical evaluation of the two tracking programs. The sum of there findings is that will use the manual software. However, using this software the tumbling events were manually put in, this was based on the assumption that any curved deviating swimming pattern was the tumbling events. This assumption clearly needs to be validated, as a result now a search into the swimming patterns of ''B.subtilis'' will be carried out. This includes liertature and contacting relevant experts to get an approximation of the swimming time. In addition the group has started to think about the data that will be collected, this includes distribution curves for velocity, tumbling times, running times. For the characterisation of wild type swimming the group feels that by the end of next week they will have there final distribution curves for these. In addition the type of characterisation of EpsE effect on motility as discussed. | *Clinton and Yanis - Carried out statistical evaluation of the two tracking programs. The sum of there findings is that will use the manual software. However, using this software the tumbling events were manually put in, this was based on the assumption that any curved deviating swimming pattern was the tumbling events. This assumption clearly needs to be validated, as a result now a search into the swimming patterns of ''B.subtilis'' will be carried out. This includes liertature and contacting relevant experts to get an approximation of the swimming time. In addition the group has started to think about the data that will be collected, this includes distribution curves for velocity, tumbling times, running times. For the characterisation of wild type swimming the group feels that by the end of next week they will have there final distribution curves for these. In addition the type of characterisation of EpsE effect on motility as discussed. | ||
*Dry lab group - By the end of next week half the dry lab team is leaving, this means there is an urgency for planning of the next two weeks in order to achieve what is required. The dry lab group will make clear aims and targets that need to be reached which will be discussed at the debreif at 5. | *Dry lab group - By the end of next week half the dry lab team is leaving, this means there is an urgency for planning of the next two weeks in order to achieve what is required. The dry lab group will make clear aims and targets that need to be reached which will be discussed at the debreif at 5. | ||
+ | *Motility - Plan to conduct data analysis on the motility of wild type B.Subtilis. Distributions of motility parameters will be determined and we may assume that EpsE does not change motility distribution but simply its parameters. | ||
*Wet lab group - 4 of the consititutive promoter and RBS combinations from geneart arrived. In addition to getting these constructs biobricked the group also have to work on PCR to get relevant ''B.subtilis'' parts from the genome and vectors, start second trial on the growth curve and begin constructing parts. A more extensive weekly plan will be uploaded tomorrow. | *Wet lab group - 4 of the consititutive promoter and RBS combinations from geneart arrived. In addition to getting these constructs biobricked the group also have to work on PCR to get relevant ''B.subtilis'' parts from the genome and vectors, start second trial on the growth curve and begin constructing parts. A more extensive weekly plan will be uploaded tomorrow. | ||
*Wiki- An internal deadline has been set, this is to upload all the information required on the new blank wiki by saturday, then in the following week the whole group will push towards getting everything checked and apllying a format so that at week 10 we have a 1st draft of our wiki. | *Wiki- An internal deadline has been set, this is to upload all the information required on the new blank wiki by saturday, then in the following week the whole group will push towards getting everything checked and apllying a format so that at week 10 we have a 1st draft of our wiki. |
Revision as of 10:48, 2 September 2008
1st September 2008Wet LabAttempts to count colonies using the illuminator failed. We have decided to count colonies manually instead. We carried out a PCR experiment in an attempt to clone genes (such as EpsE, AmyE integration sites etc.) from vectors. However, due to problems with the image viewer, we did not manage to take an image of the gel by the end of the day. Cloning
DebriefingToday we had an extensive debreifing session, the notes below summaries the key points:
|