Team:Paris/September 2
From 2008.igem.org
(Difference between revisions)
(→Ligation L172 (rbs-FlhDC in mRFP-LVA-tripart-pSB1A3)) |
(→Ligation L173 (rbs-TetR in mRFP-LVA-tripart-pSB1A3)) |
||
Line 1: | Line 1: | ||
{{Paris/Calendar_Links|September 1|September 3}} | {{Paris/Calendar_Links|September 1|September 3}} | ||
- | = | + | =Construction of rbs-TetR-mRFP-LVA-tripart= |
+ | |||
+ | '''Ligation L173''' | ||
'''Samples used''' | '''Samples used''' | ||
Line 61: | Line 63: | ||
*Put in the room "Danger azote" at about 16°C at 18h00 (for overnight reaction). | *Put in the room "Danger azote" at about 16°C at 18h00 (for overnight reaction). | ||
<br> | <br> | ||
+ | |||
=Construction of rbs-FlhDC-mRFP-LVA-tripart= | =Construction of rbs-FlhDC-mRFP-LVA-tripart= | ||
Revision as of 20:18, 3 September 2008
Construction of rbs-TetR-mRFP-LVA-tripartLigation L173 Samples used
Construction of rbs-FlhDC-mRFP-LVA-tripartSamples used
|