Team:Warsaw/Calendar-Main/25 June 2008
From 2008.igem.org
(Difference between revisions)
MKrzyszton (Talk | contribs) |
|||
Line 5: | Line 5: | ||
<p>'''Preparation of pMPMT5-AID+AIDT7 construct''' <br> | <p>'''Preparation of pMPMT5-AID+AIDT7 construct''' <br> | ||
- | 1. | + | 1. Digestion of isolated PCR product (from previous day) and pMPMT5-AID with HindIII and XbaI, dephosphorylation of pMPMT5-AID with CIAP <br> |
2. Clean-up of digested PCR product. <br> | 2. Clean-up of digested PCR product. <br> | ||
3. Gel electrophoresis of digested pMPMT5-AID and gel-out of proper band (trzeba dodac wielkosc)<br> | 3. Gel electrophoresis of digested pMPMT5-AID and gel-out of proper band (trzeba dodac wielkosc)<br> |
Revision as of 13:39, 27 September 2008