September
From 2008.igem.org
WeberSimone (Talk | contribs) |
|||
Line 41: | Line 41: | ||
<h3>Sep. 12th 2008</h3> | <h3>Sep. 12th 2008</h3> | ||
- | '''1) Origami with NIP and fluorophor for the binding measurement''' | + | '''1) Origami with NIP and fluorophor for the binding measurement (Norman+Simone)''' |
We had to produce some new origami for our next binding measurements. | We had to produce some new origami for our next binding measurements. | ||
Line 51: | Line 51: | ||
see at the protocol from 07-24-2008 | see at the protocol from 07-24-2008 | ||
- | '''2) Origami for the Calciummeasurement''' | + | '''2) Origami for the Calciummeasurement (Norman+Simone)''' |
* Origami with NIP | * Origami with NIP | ||
Line 108: | Line 108: | ||
</table> | </table> | ||
- | '''3) Master cycler''' | + | '''3) Master cycler (Norman+Simone)''' |
The origamis were produced in the mastercycler as explained before. | The origamis were produced in the mastercycler as explained before. | ||
- | '''4) Purification of the DNA Origami''' | + | '''4) Purification of the DNA Origami (Norman+Simone)''' |
Was done as before | Was done as before |
Revision as of 17:30, 22 October 2008
__september
Sep. 10th 2008
For a 50 µl reaction: The settings for the PCR machine are the following: No product was received. Sep. 11th 2008
Sep. 12th 20081) Origami with NIP and fluorophor for the binding measurement (Norman+Simone) We had to produce some new origami for our next binding measurements.
see at the protocol from 07-24-2008 2) Origami for the Calciummeasurement (Norman+Simone)
see at the protocol from 07-24-2008 To increase the concentration of origami we also made to probes with the double amount ingredients of the protocol from 07.24.2008
3) Master cycler (Norman+Simone) The origamis were produced in the mastercycler as explained before. 4) Purification of the DNA Origami (Norman+Simone) Was done as before 5) Digestion of CMV+Rluc (Sabine) Digestion with EcoRV und FspI (3h at 37°C)
File:Verdau CMVRluc EcoRV FspI klein.jpg
Sep. 15th 2008CMV-PCR (Sabine)
Sep. 16th 2008Gel purification (Sabine) Digestion of the PCR products and the transfectionvector (Sabine, Kathrin)
Sep. 18th 2008Transformation (Sabine)
Sep. 19th 2008Transformation (Sabine)
Sep. 20th 2008Digestion of the PCR products and the transfection-vector (Sabine) Gel purification and ligation (Sabine)
Sep. 21st 2008Transformation of the ligation (Sabine) Sep. 23rd 20081. Transformation of the 4 plasmids of ATG (michael) Sep. 24th 20081. Transformation (michael) Sep. 25th 2008Miniprep (normann) Sep. 26th 2008Transformation of the 'ligation 2nd try' (michael) |