Team:Harvard/Dailybook/Week12/Widgetry

From 2008.igem.org

Revision as of 22:08, 26 October 2008 by Workman (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Bline2.jpg

Repeat Chemical and Heat Baseline Test


What we did:

-Retested wt Shewie with IPTG added, Tet added, and heated to 40C to different chambers


Results:

-Heating the chambers to 40C led to no current production

-May have been a problem with the setup as Shewie seemed to have leaked out

-wt Shewie with IPTG and Tet added had normal current production

-Current observed was between the two wt controls