Calendar
1.1
July
1.2
August
1.3
September
1.4
October
2
Todo
2.1
Design a modular Matlab modelisation of our system
2.2
Implement the same models in BIOCHAM
2.3
MGS
Calendar
July
07/31
- Have a full bibliography ⇒
DONE
August
08/07
- First model of the FIFO temporal order, of the backward control inducing the oscillations ⇒
DONE
08/07
- Model the synchronization between cells, using Biocham
08/15
- Summary about the ODE method, Space introduction into models (AC, Delaunay)
08/22
- Feedback: list missing things (parameters), Optimization, Robustness analysis
September
09/22
- Checkpoint meeting
October
10/15
- Scheduled wiki ending (2 weeks before the real ending to finish details)
10/31
- Official wiki ending (date to be checked)
Todo
Design a modular Matlab modelisation of our system
Using the following approach:
3 modules corresponding to the FIFO Temporal Order function, the Oscillation's one and the Sync function.
Gather the 3 modules using a blackbox approach: each function is a box having its own inputs and outputs and does not interact with the others.
Divide each box in smaller parts that we can quickly try in the wet lab to figure out precisely some missing parameters.
Implement the same models in BIOCHAM
It will allow easier:
Exploration of the paramaters space
Evalution of the robustness
Changes (to a stochastic model for example)
MGS
Understand the syntax!
Develop a 3D model to simulate diffusion even if the medium will in fact be shook.