10.30-17h in labs and room 00.210 of the LBI
Present: all students (Jonas excused), SDK
- Fill out contact forms and confidentiality agreements
- Visit the labs
- Further workout concerning the project.
- Big problems, we forgot a lock-key mechanism yesterday. Trying to solve the problem with a second ribolock-key failed. We now focus on a small non-coding regulatory RNA (sRNA) to use within the filter and the ribolock-key to make sure our cells are not coded to all die before we can use them. Also, as the T7 RNA polymerase is -even with LVA tag- much more stable than mRNA, so that would not have worked anyway.
- A lot of modeling tests have been performed using CellDesigner.
- Advisors will be invited somewhere next week to come and have a look at the things we had up to now, so they can tell us if we screwed it up or not. Bmoeyaert