Minnesota/1 August 2008
From 2008.igem.org
Revision as of 15:50, 4 August 2008 by Emartin9808 (Talk | contribs)
Back to Notebook Home | |
Go to Previous Day (July 31) | Go to Next Day (August 4) |
1. Ran the terminator digest out on a gel: After which we were unable to see a band the appropriate length, so we simply cut out the gel where we expected the band to be (terminator is very small - so hard to see). Gel purified - then used this in our next ligation. When spec'ed the purified gel terminator product, there were 2.5ngram/uL of DNA concentration. |
2. Currently have two parts that are base vector-promoter-gene, and one that is base vector-promoter: We are currently ligating the terminator to the two parts that have vector-promoter-gene. |