Beijing Normal/5 October 2008

From 2008.igem.org

Revision as of 04:59, 8 October 2008 by Sally730 (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

T7 amplification system construction failed. We analysed that the time for digestion was not long enough. Because XbaI's has a relatively low activity in this double digestion system using NEB Buffer 3. So next time we will try longer digestion time, about 5h.