Team:NTU-Singapore/Notebook/25 July 2008
From 2008.igem.org
Revision as of 02:33, 28 October 2008 by Lalala8585 (Talk | contribs)
|
Friday 25 July
Heat inactivation at 80 celcius in thermal cycler before gel run.
Lysis standard vector is successful, showed a band between 100bp and 200bp(140bp) LsrA standard vector failed. Lysis Terminator was kept in the fridge for saturday gel run due to time constraits i had on friday.
|