Imperial College/1 August 2008

From 2008.igem.org

(Difference between revisions)
m
m
Line 1: Line 1:
 +
__NOTOC__
{{Imperial/StartPage}}
{{Imperial/StartPage}}
 +
= 1 August 2008 =
 +
<html><blink>Project description due today!</blink></html>
 +
== Sequencing ==
 +
*All the sequencing work is now completed.  All that is left to do now is to check over all the sequences again with the help from the rest of the team.
 +
*ETA: Monday - to have a list of constructs and protocols ready
-
=1 August 2008=
+
==Wet lab==
-
Project description due today!
+
*For next week, a priority list for protocols and the protocols for testing experiments (eg for using the microscope) is needed.
 +
*Culturing will start next week.
 +
*Will need to look more closely at proceedings within the wet lab.
-
Think we've got this covered... [:
+
==Dry lab==
 +
*The group have been working on tutorial 1 and will continue workingt on tutorial 2 next week.
 +
*Next week, some focus will be on familiarising ourselves with a suitable tracking software and on practising using the software.
{{Imperial/EndPage}}
{{Imperial/EndPage}}

Revision as of 09:48, 6 August 2008

1 August 2008

Project description due today!

Sequencing

  • All the sequencing work is now completed. All that is left to do now is to check over all the sequences again with the help from the rest of the team.
  • ETA: Monday - to have a list of constructs and protocols ready

Wet lab

  • For next week, a priority list for protocols and the protocols for testing experiments (eg for using the microscope) is needed.
  • Culturing will start next week.
  • Will need to look more closely at proceedings within the wet lab.

Dry lab

  • The group have been working on tutorial 1 and will continue workingt on tutorial 2 next week.
  • Next week, some focus will be on familiarising ourselves with a suitable tracking software and on practising using the software.

    [[Team:Imperial_College/{{{1}}}|< Previous]]
    [[Team:Imperial_College/{{{2}}}|Next >]]