Team:Beijing Normal/Notebook
From 2008.igem.org
(Difference between revisions)
(→Dynamics) |
(→Dynamics) |
||
Line 31: | Line 31: | ||
**9th September We and Tsinghua team get together in our lab. We have a happy time together and share a lot. | **9th September We and Tsinghua team get together in our lab. We have a happy time together and share a lot. | ||
- | **10th September We provide Tsinghua Team with the cells harboring pSB1AC3 plasmids. Because they found their transformation effeciency is relatively low. | + | **10th September We provide Tsinghua Team with the cells harboring pSB1AC3 plasmids. We do the the tramsformation for them. Because they found their transformation effeciency is relatively low. |
**17th September Tsinghua Team told us that the vector that we provided proved to work well. We are all pretty happy about this positive result. | **17th September Tsinghua Team told us that the vector that we provided proved to work well. We are all pretty happy about this positive result. |
Revision as of 08:27, 3 October 2008
![]() | Home | The Team | The Project | Parts Submitted to the Registry | Modeling | Notebook |
---|
Dynamics
- == Communications ==
- 17th June Attend the Asian Workshop meeting.
- 17th July Meet up with Tsinghua Team, and learn fron their experiences.
- 25th July With Invitrogen.Co. Ltd and Tsinghua team to sign up a contract.
- 27th July Have a discussion with Tsinghua team about the transformation efficiency.
We generalize some key words from the discussion:
1. Make sure the concentration of the plasmids from the biobrick is enough for transformation.
2. Keep a low temprature when enzyme digestion is performed
3. The transformation product are always incubated for more than 1h.
- 9th September We and Tsinghua team get together in our lab. We have a happy time together and share a lot.
- 10th September We provide Tsinghua Team with the cells harboring pSB1AC3 plasmids. We do the the tramsformation for them. Because they found their transformation effeciency is relatively low.
- 17th September Tsinghua Team told us that the vector that we provided proved to work well. We are all pretty happy about this positive result.
July | ||||||
M | T | W | T | F | S | S |
1 | 2 | 3 | 4 | 5 | 6 | |
7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 | 26 | 27 |
28 | 29 | 30 | 31 |
August | ||||||
M | T | W | T | F | S | S |
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 | 31 |
September | ||||||
M | T | W | T | F | S | S |
1 | 2 | 3 | 4 | 5 | 6 | 7 |
8 | 9 | 10 | 11 | 12 | 13 | 14 |
15 | 16 | 17 | 18 | 19 | 20 | 21 |
22 | 23 | 24 | 25 | 26 | 27 | 28 |
29 | 30 |
October | ||||||
M | T | W | T | F | S | S |
1 | 2 | 3 | 4 | 5 | ||
6 | 7 | 8 | 9 | 10 | 11 | 12 |
13 | 14 | 15 | 16 | 17 | 18 | 19 |
20 | 21 | 22 | 23 | 24 | 25 | 26 |
27 | 28 | 29 | 30 | 31 |