Team:Beijing Normal/Notebook

From 2008.igem.org

Revision as of 08:27, 3 October 2008 by Sally730 (Talk | contribs)
thum Home The Team The Project Parts Submitted to the Registry Modeling Notebook

Bnu.jpg

Dynamics

  • == Communications ==
    • 17th June Attend the Asian Workshop meeting.
    • 17th July Meet up with Tsinghua Team, and learn fron their experiences.
    • 25th July With Invitrogen.Co. Ltd and Tsinghua team to sign up a contract.
    • 27th July Have a discussion with Tsinghua team about the transformation efficiency.

We generalize some key words from the discussion:

1. Make sure the concentration of the plasmids from the biobrick is enough for transformation.

2. Keep a low temprature when enzyme digestion is performed

3. The transformation product are always incubated for more than 1h.


    • 9th September We and Tsinghua team get together in our lab. We have a happy time together and share a lot.
    • 10th September We provide Tsinghua Team with the cells harboring pSB1AC3 plasmids. We do the the tramsformation for them. Because they found their transformation effeciency is relatively low.
    • 17th September Tsinghua Team told us that the vector that we provided proved to work well. We are all pretty happy about this positive result.


July
MTWTFSS
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
August
MTWTFSS
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
September
MTWTFSS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
October
MTWTFSS
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31