June 2nd, 2008

We had our first meeting today. The basic software of Clotho was explained and the tasks that each student had to perform were outlined. The expectations were described and the computing environment requirements were also explained.

Week of June 8th, 2008

This week several key logistic issues were resolved:

  1. Key card access for all students was enabled for the DOP Center
  2. Each student received physical keys for Stanley hall
  3. A computer account, computer, port activation, and ID card were all obtained for Anne


In addition we have started a bug tracking spreadsheet for Clotho as well as a feature list spreadsheet. Anne joined the team this week.

Week of June 15th, 2008

We met with Prof. Anderson to demo Clotho and begin to talk about advanced features for the project.

We have decided that Clotho will be composed of the following four areas:

  • Connectivity
  • Algorithms/Tools
  • "Lim" support
  • Unique design entry and views

The optimal assembly algorithms were discussed and Anne will be implementing the infrastructure to support them this week. Chris Batten and Will will be working with her to get

Here are some screenshots of interest. They display the sequence view in Clotho as well as the ability of the tool to connection to and query mySQL based databases for parts.

First pass at Clotho's sequence view

The sequence view slows the sequence for the current design. It is based on ApE's interface currently.

First pass at Clotho's interfaces to mySQL connections and a preliminary parts navigator

These windows show how mySQL database connections can be specified. This stores multiple connections with one currently active connection. The user can select from any previously created connection to be active. Upon connection, the available fields are shown. The user then can select the primary field used for organization.

In the navigator, the parts for the various connections are shown. If a part is double clicked, the part information comes up. These connections can be searched, as well as have parts added, removed, or modified.