Team:Bologna/Notebook
From 2008.igem.org
(Difference between revisions)
(→Week 3: from 08/04/08 to 08/10/08) |
|||
Line 11: | Line 11: | ||
[[Image:Logo1a.gif|220px]][[Image:Testata_dx.jpg|745px]] | [[Image:Logo1a.gif|220px]][[Image:Testata_dx.jpg|745px]] | ||
!align="center"|[[Team:Bologna|HOME]] | !align="center"|[[Team:Bologna|HOME]] | ||
- | |||
!align="center"|[[Team:Bologna/Team|TEAM]] | !align="center"|[[Team:Bologna/Team|TEAM]] | ||
- | !align="center"|[[Team:Bologna/ | + | !align="center"|[[Team:Bologna/Project|PROJECT]] |
!align="center"|[[Team:Bologna/Modeling|MODELING]] | !align="center"|[[Team:Bologna/Modeling|MODELING]] | ||
- | !align="center"|[[Team:Bologna/ | + | !align="center"|[[Team:Bologna/Software|SOFTWARE]] |
- | !align="center"|[[Team:Bologna/Notebook| | + | !align="center"|[[Team:Bologna/Notebook|WET-LAB]] |
+ | !align="center"|[[Team:Bologna/Parts|SUBMITTED PARTS]] | ||
!align="center"|[[Team:Bologna/Biosafety|BIOSAFETY AND PROTOCOLS]] | !align="center"|[[Team:Bologna/Biosafety|BIOSAFETY AND PROTOCOLS]] | ||
|} | |} |
Revision as of 08:35, 24 October 2008
HOME | TEAM | PROJECT | MODELING | SOFTWARE | WET-LAB | SUBMITTED PARTS | BIOSAFETY AND PROTOCOLS |
---|
Under notebook are all relevant information regarding the work done every week in the laboratory and protocols followed.
Protocols
Protocol | Biosafety level |
Plates preparation | |
Amplification | |
Transformation | |
Inoculation | |
Miniprep | |
Digestion reaction | |
Gel preparation | |
Electrophoretic run | |
Gel extraction | |
Ligation reaction | |
Chemiocompetent cells | |
Mediums and buffers | |
Antibiotics stocks preparation | |
IPTG stocks preparation | |
Fluorescence test | |
M9 supplemented media | |
Week 1: from 07/21/08 to 07/27/08
General Preparations
- Preparation of chemiocompetent cells from E. Coli DH5α, Top10 and DB 3.1
- Preparation of antibiotic stocks for Ampicillin and Kanamicin
- Preparation of LB medium and LB plates for cloning.
Week 2: from 07/28/08 to 08/03/08
- Eluition and Amplification from 2008 Registry Collection: [http://partsregistry.org/Part:BBa_R0082 R0082,] [http://partsregistry.org/Part:BBa_R0083, R0083], [http://partsregistry.org/wiki/index.php/Part:BBa_M30109 M30109] in TOP10 strain to build and characterize the Light response system to be our spatial selective trigger.
- Eluition and Amplification from 2008 Registry Collection: [http://partsregistry.org/Part:BBa_E0240 E0240], [http://partsregistry.org/Part:BBa_P1010 pSB3K3_P1010]in DB3.1 and the Practice Promoter Set ([http://partsregistry.org/wiki/index.php?title=Part:BBa_J23103/ J23150, J23151, J23102]) to test and set up the new [http://partsregistry.org/Measurement Biobrick Standard Measurement Protocol]
- Transformation and Amplification from our Lab Stock of [http://partsregistry.org/Part:BBa_S0100 S0100], [http://partsregistry.org/wiki/index.php?title=Part:BBa_I763005 I763005] and [http://partsregistry.org/Part:BBa_C0051 C0051]
- Growth Curves of Dh5 Alpha, Top10 and XL1 Blue with Low Medium and High Copy Numbers to assay and define the different kinetics (Further Detail)
Week 3: from 08/04/08 to 08/10/08
08/04/08
- Digestion and Control Gel Run of the previous amplified constructs :
1. S0100 E/S
Consistent Part Length
2. PLAC-CI X/P
Consistent Part Length
3. R0083 S/P
Single Vector Band as Expexted. Is Hard to verify the Part length correctness given the small size
4. R0082 S/P
Single Vector Band as Expexted. Is Hard to verify the Part length correctness given the small size
5. C0051 X/P
Consistent Part Length.
7. M30105 E/S
The Part appears not consistent. The Gel has unexpected multiple bands.
8. RBS GFP TAG X/P
Consistent Part Length
9.Pλ GFP X/P
Consistent Part Length.
- Ligation of R0082 and R0083 with E0240 to obtain a Reporter for the Light Driven Trigger.
Week 4: from 08/11/08 to 08/17/08
Week 5: from 08/18/08 to 08/24/08
Week 6: from 08/25/08 to 08/31/08
Week 7: from 09/01/08 to 09/07/08
Week 8: from 09/08/08 to 09/14/08
Week 9: from 09/15/08 to 09/21/08
Week 10: from 09/22/08 to 09/28/08
Week 11: from 09/29/08 to 10/05/08
Week 12: from 10/06/08 to 10/12/08
Week 13: from 10/13/08 to 10/19/08
Week 14: from 10/20/08 to 10/26/08
Week 15: from 10/27/08 to 10/29/08