Beijing Normal/23 September 2008

From 2008.igem.org

(Difference between revisions)
(New page: We had a discussion about the final version of our design. And Stephen tought us to perform the site mutation experiment.)
 
Line 1: Line 1:
We had a discussion about the final version of our design. And Stephen tought us to perform the site mutation experiment.
We had a discussion about the final version of our design. And Stephen tought us to perform the site mutation experiment.
 +
 +
T7 termitor was used.http://partsregistry.org/Part:BBa_S03582
 +
ce Plate 1020( Well 3A ). We transformed this parts into top10 for further use.

Latest revision as of 05:02, 8 October 2008

We had a discussion about the final version of our design. And Stephen tought us to perform the site mutation experiment.

T7 termitor was used.http://partsregistry.org/Part:BBa_S03582 ce Plate 1020( Well 3A ). We transformed this parts into top10 for further use.