Team:Paris/Modeling/Roadmap

From 2008.igem.org

(Difference between revisions)
(Todo)
(Todo)
Line 21: Line 21:
==Todo==
==Todo==
* Continue the previous model
* Continue the previous model
-
    ** Synchronyzation
+
** Synchronyzation
-
    ** Estimation of the FIFO processes
+
** Estimation of the FIFO processes
-
    ** Stochastic modeling (Gilespie)  
+
** Stochastic modeling (Gilespie)  
-
 
+
*Test of robustness
*Test of robustness
     **repressilator
     **repressilator
     ** comparison  
     ** comparison  
-
 
*Enhancing the system
*Enhancing the system
     **Better FIFO behaviour
     **Better FIFO behaviour

Revision as of 13:31, 6 August 2008

Contents

Calendar

July

  • 07/31 - Have a full bibliography ⇒ DONE

August

  • 06/07 - First model of the FIFO temporal order, of the backward control inducing the oscillations ⇒ DONE
  • 08/07 - Model the synchronization between cells, using Biocham
  • 08/15 - Summary about the ODE method, Space introduction into models (AC, Delaunay)
  • 08/22 - Feedback: list missing things (parameters), Optimization, Robustness analysis

September

  • 09/22- Checkpoint meeting

October

  • 10/15 - Scheduled wiki ending (2 weeks before the real ending to finish details)
  • 10/31 - Official wiki ending (date to be checked)

Todo

  • Continue the previous model
    • Synchronyzation
    • Estimation of the FIFO processes
    • Stochastic modeling (Gilespie)
  • Test of robustness
   **repressilator
   ** comparison 
  • Enhancing the system
   **Better FIFO behaviour
   **Other interactions to increase the robustness