Wisconsin: Lignin Project/9 July 2008
From 2008.igem.org
(Difference between revisions)
(New page: == Team Sorbitol == The sequencing was cleaned with Agencourt CleanSEQ dye-Terminator removal). It was then taken to the UW-biotech center for sequencing. Attended the Wisconsin iGEM te...) |
|||
Line 1: | Line 1: | ||
- | = | + | <div style="background: #000; padding: 10px;"> |
- | + | <div style="width:800px; height:147px; border:0px; margin:0px;">[[Image:Igemwibanner.gif]]</div> | |
- | It was then taken to the UW-biotech center for sequencing. | + | {|align="justify" style="color:#aada84;background-color:#000;" width="800 px" |
- | + | |'''Team Sorbitol:'''<br> | |
- | Attended the Wisconsin iGEM team meeting. | + | The sequencing was cleaned with Agencourt CleanSEQ dye-Terminator removal).<br> |
+ | It was then taken to the UW-biotech center for sequencing.<br> | ||
+ | Attended the Wisconsin iGEM team meeting.<br> | ||
+ | |} |
Revision as of 15:40, 8 August 2008
Team Sorbitol: The sequencing was cleaned with Agencourt CleanSEQ dye-Terminator removal). |