Team:CPU-NanJing/Notebook

From 2008.igem.org

(Difference between revisions)
(Schedule)
(News)
 
(3 intermediate revisions not shown)
Line 4: Line 4:
|width=50px|
|width=50px|
|width=700px|
|width=700px|
 +
*Design our team-shirt!(10-29)
*Modeling work should be finished as soon as possible.(10-28)
*Modeling work should be finished as soon as possible.(10-28)
*The work of wiki is going to be finished.(10-28)
*The work of wiki is going to be finished.(10-28)
Line 9: Line 10:
*The tickets need be reserved as soon as possible.(10-27)
*The tickets need be reserved as soon as possible.(10-27)
*The Powerpoint for the presentation is urgent to be prepared.(10-25)
*The Powerpoint for the presentation is urgent to be prepared.(10-25)
 +
*Visa application.(10-20)-''finished''
|[[Image:cpu-logo.png|frame]]
|[[Image:cpu-logo.png|frame]]
|}
|}
Line 18: Line 20:
<table border="0" width="100%">
<table border="0" width="100%">
<tr>
<tr>
-
<td align="center" width="50"> </td>
 
<td align="center" bgcolor="#808080">
<td align="center" bgcolor="#808080">
<font face="Arial Unicode MS" size="4" color="#FFFFFF">Time</font></td>
<font face="Arial Unicode MS" size="4" color="#FFFFFF">Time</font></td>
Line 25: Line 26:
</tr>
</tr>
<tr>
<tr>
-
<td align="center" width="50"> </td>
 
<td align="center"><font face="Arial Unicode MS">April-2008</font></td>
<td align="center"><font face="Arial Unicode MS">April-2008</font></td>
-
<td align="center"><font face="Arial Unicode MS">Pre-registry discussion  
+
<td align="center"><font face="Arial Unicode MS">Pre-registration discussion  
of the project</font></td>
of the project</font></td>
</tr>
</tr>
<tr>
<tr>
-
<td align="center" width="50"> </td>
 
<td align="center">
<td align="center">
<span lang="EN-US" style="font-family: Arial Unicode MS">May-1-2008</span></td>
<span lang="EN-US" style="font-family: Arial Unicode MS">May-1-2008</span></td>
<td align="center">
<td align="center">
-
<span lang="EN-US" style="font-family: Arial Unicode MS">Team registry</span></td>
+
<span lang="EN-US" style="font-family: Arial Unicode MS">Team registration</span></td>
</tr>
</tr>
<tr>
<tr>
-
<td align="center" width="50"> </td>
 
<td align="center">
<td align="center">
<span lang="EN-US" style="font-family: Arial Unicode MS">&nbsp;May-June-2008</span></td>
<span lang="EN-US" style="font-family: Arial Unicode MS">&nbsp;May-June-2008</span></td>
Line 46: Line 44:
</tr>
</tr>
<tr>
<tr>
-
<td align="center" width="50"> </td>
 
<td align="center">
<td align="center">
<span lang="EN-US" style="font-family: Arial Unicode MS; color: black">
<span lang="EN-US" style="font-family: Arial Unicode MS; color: black">
Line 55: Line 52:
</tr>
</tr>
<tr>
<tr>
-
<td align="center" width="50"> </td>
 
<td align="center">
<td align="center">
<span lang="EN-US" style="font-family: Arial Unicode MS; color: black">
<span lang="EN-US" style="font-family: Arial Unicode MS; color: black">
Line 64: Line 60:
</tr>
</tr>
<tr>
<tr>
-
<td align="center" width="50"> </td>
 
<td align="center">
<td align="center">
<span lang="EN-US" style="font-family: Arial Unicode MS">Oct-25-2008</span></td>
<span lang="EN-US" style="font-family: Arial Unicode MS">Oct-25-2008</span></td>
Line 72: Line 67:
</tr>
</tr>
<tr>
<tr>
-
<td align="center" width="50"> </td>
 
<td align="center">
<td align="center">
<span lang="EN-US" style="font-family: Arial Unicode MS; color: black">
<span lang="EN-US" style="font-family: Arial Unicode MS; color: black">

Latest revision as of 02:11, 29 October 2008

  Home The Team  
The Project Submitted Parts
Notebook Link

News

  • Design our team-shirt!(10-29)
  • Modeling work should be finished as soon as possible.(10-28)
  • The work of wiki is going to be finished.(10-28)
  • The team photo should be added to wiki.(10-28)
  • The tickets need be reserved as soon as possible.(10-27)
  • The Powerpoint for the presentation is urgent to be prepared.(10-25)
  • Visa application.(10-20)-finished
Cpu-logo.png

Schedule

Time Events
April-2008 Pre-registration discussion of the project
May-1-2008 Team registration
 May-June-2008 Experimental procedure design
July-September-2008 Lab Work & Wiki development
October-2008 Conclusion & Visa application
Oct-25-2008 Presentation Preparation & Modeling work
Nov-8-9-2008 Jamboree in MIT