Team:Brown/Notebook/Timeline
From 2008.igem.org
(Difference between revisions)
Line 30: | Line 30: | ||
*Multiple versions of the testing apparatus were made throughout the summer. Initial designs included legos, skewers, pipette tips, and copper electrodes. As the summer progressed, our apparatus became more complex. We quickly made the transition from standard voltmeter to a Data Acquisition Card coupled with LabView Computer Software. We quickly ditched the multi-stranded copper wires for Gold plated and Gold electrodes. In addition, we moved to an alternating current to prevent the ions from settling on the electrodes and affecting current. | *Multiple versions of the testing apparatus were made throughout the summer. Initial designs included legos, skewers, pipette tips, and copper electrodes. As the summer progressed, our apparatus became more complex. We quickly made the transition from standard voltmeter to a Data Acquisition Card coupled with LabView Computer Software. We quickly ditched the multi-stranded copper wires for Gold plated and Gold electrodes. In addition, we moved to an alternating current to prevent the ions from settling on the electrodes and affecting current. | ||
- | ===Week Three=== | + | ====Week Three==== |
*Continued apparatus work in cooperation with Professor Jerry Daniels in Engineering and Daniel Ludwig, Biomedical Engineering '09. | *Continued apparatus work in cooperation with Professor Jerry Daniels in Engineering and Daniel Ludwig, Biomedical Engineering '09. | ||
+ | *We made serial dilutions of salt water to standardize the apparatus. |
Revision as of 12:38, 27 October 2008
Timeline as presented to Faculty Mentors and Graduate Advisors in May:
Actual TimelineWeek One
Week Two
Week Three
|