Brown: Team Resistance/26 October 2008
From 2008.igem.org
(Difference between revisions)
(New page: {{BNBK}} ===26 October 2008=== *Made new culture of the PVJ4 transformation so that a miniprep can be done. *New culture of gene S105 part made. *Will run a gel of the S105 gene restri...) |
(→26 October 2008) |
||
Line 5: | Line 5: | ||
*New culture of gene S105 part made. | *New culture of gene S105 part made. | ||
- | *Will run a gel of the S105 gene restriction digest with EcoRI and SpeI for verification of part. | + | *Will run a gel of the S105 gene restriction digest with EcoRI and SpeI for verification of part. The gel showed a faint band at the length we hoped for but there was no other band verifying the vector. We should have seen two bands but we only saw one. |
+ | |||
+ | |||
+ | ====Conductivity Tests==== | ||
+ | |||
+ | *PVJ4 Colony 2 and 4 plus Controls. 10ml cultures. 420 ul of 50% Arabinose solution will be added. Conductance measurements will be taken before and after lysis has occurred. | ||
+ | *Throughout the test, Optical Density measurements will be taken. |
Revision as of 20:05, 26 October 2008
26 October 2008
Conductivity Tests
|