Imperial College/5 August 2008
From 2008.igem.org
m |
m |
||
Line 1: | Line 1: | ||
{{Imperial/StartPage}} | {{Imperial/StartPage}} | ||
+ | {| cellpadding="10" border="0" | ||
+ | |- valign="top" | ||
+ | |{{#calendar: title=Imperial_College |year=2008 | month=07}} | ||
+ | |{{#calendar: title=Imperial_College |year=2008 | month=08}} | ||
+ | |{{#calendar: title=Imperial_College |year=2008 | month=09}} | ||
+ | | rowspan="2" bgcolor=#fff width="100%" | | ||
+ | |} | ||
= 5 August 2008 = | = 5 August 2008 = | ||
== Briefing == | == Briefing == |
Revision as of 09:54, 6 August 2008
5 August 2008Briefing
DebriefVincent put up a list of things he wants to know about... sometime... It's a good way to structure our work, anyhow. It's pasted below, please put your names next to things you'll take care of! Basically I've made a few pages (linked in the Navbar) for each team, and we need to put up concise explanations and summaries of progress. Eventually we'll probably copy and paste a lot of this to the official wiki; so when you're doing internal links, please call them Team:Imperial_College/PageName. That way when we copypasta everything over, pages will already point to the right place... Oh, and if you make a new page, remember to put {{Imperial/StartPage}} at the top and {{Imperial/EndPage}} at the bottom. [: "Hi iGEMers, I hope you are all doing well. I would be really interested to catch-up with the iGEM project. Before we meet again, could someone send me a list of links from your OWW wiki related to the following topics (please no .doc or .pdf as they are not collaboration friendly): 1- Design of your final construct + basic description of its expected behaviour (no sequences needed) - Tom 2- Design of your test constructs + basic description of their use (no sequences needed)- James 3 - Protocols: - wet lab group + b.subtilis culture + b.subtilis comptent cell preparation + b.subtilis DNA chromosomal integration + b.subtilis and time lapse microscopy + b.subtilis motility assay + test construct protocols + others that I have missed ? 4 - Your wet lab shopping list - james 5 - Update on the motility analysis - erika 6 - Update on the biomaterial production - prudence 7 - Update on the light sensing system - clinton 8 - description of the different working groups (people involved and scope of the working group) - 9 - Your current planning for the project and sub-projects (deadlines and deliverables) 10 - Also it would be great if you could also comment on the current challenges you are facing in the project - everyone thanks and see you soon, Vincent."
|